Two questions (so far

)
The order in the list of doors in a Door Schedule appears to be random, not alphabetical on the Description nor does it follow any sequence on the plan (eg top left to bottom right) as far as I can see.
Is there any way to control the order of the doors (other than manually reshuffling them obviously)?ALSO.
One of the options, for a new field is Rough Opening Height and Rough Opening Width so....
Is there a way to define how much additional space is added to the door size to generate the opening size? For example: door width + 100mm and door height + 50mm to give a 50mm space around the door.
Allan